References
(*) IE = Instrument Engineering; SI = System Integration
| DETAILS & PHOTOS | TYPE (*) | YEAR | PROJECT | PLANT / LOCATION | ACTIVITIES | CLIENT | END USER | MANUF. - SYSTEM MODEL |
PROJECT VALUE / MAN HRS |
|---|---|---|---|---|---|---|---|---|---|
| SI | 2008 | MARSHALLING CABINET ASSEMBLY INTEGRATION | GTL QATAR | HONEYWELL CONTROLS INT. | SHELL GTL | 1,200K € | |||
| SI | 2008 | DCS / ESD EXPANSION | GDANSK REFINERY POLAND | HONEYWELL S.P.A. | LOTOS | TPS HONEYWELL | 204K € | ||
| SI | 2008 | CONTROL AND SAFETY SYSTEM | POWER GENERATION UNIT NOVARA (ITALY) | TURBOMACH SA | KIMBERLY CLARK | S7-400S7-400F SIEMENS | 240K € | ||
| SI | 2008 | SYSTEM REVAMPING | SYNTHESIS PLANT ITALY | SIEMENS | IBI SUD S.P.A. | PCS7/7 SIEMENS | 122K € | ||
| SI | 2008 | DCS / ESD CONFIGURATION | HYDROGEN GENERATION UNIT LITUANIA | INVENSYS SYSTEM ITALIA | AB MAZMIKIU NAFTA | I/A SERIES INVENSYS | 65K € | ||
| SI | 2008 | ESD SYSTEM SUPPLY & CONFIGURATION | HDS PLANT PLOCK POLAND | INVENSYS SYSTEM ITALIA | PKN ORLEN S.A. | TRICONEX INVENSYS | 78K € | ||
| SI | 2008 | ESDL SYSTEM CONFIGURATION | PARAXILENE PLOCK POLAND | INVENSYS SYSTEM ITALIA | PKN ORLEN S.A. | TRICONEX INVENSYS | 177K € | ||
| SI | 2007 2008 | MARSHALLING CABINET ASSEMBLY INTEGRATION | KINEF HYDROCRACKER COMPLEX KIRISHI RUSSIA | HONEYWELL CONTROL INT. | KINEF | 2,500K € | |||
| SI | 2007 2008 | FISCAL INVOICING SOFTWARE DESIGN & IMPLEMENTATION, DISTRIBUTE SERVER, ARCHITECTURE | EAST MEDITERRANEAN GAS EGYPT | KTI STAR | KTI STAR | SEQUEL SERVER 2005 - WONDERWARE INSQL VISUAL BASIC | 53K € | ||
| SI | 2007 2008 | SYSTEM EXPANSION | UREA QATAR | HONEYWELL | QAFCO | TPS HONEYWELL | 121K € | ||
| SI | 2007 2008 | SUPERVISION ELECTRICAL NETWORK, SEQUENCE OF EVENTS | REFINERY CAGLIARI (ITA) | ROCKWELL AUTOMATION | SARAS SARROCH | CONTROL LOGIX FACTORY TALK 5 ROCKWELL | 301K € | ||
| SI | 2007 2008 | CONTROL SYSTEM INTEGRATION ESD / FIRE & GAS / DCS | FUEL HYDROTREATMENT (HDT) COLOMBIA | INVENSYS SYSTEM ITALIA | ECOPETROL S.A. | I/A SERIES-TRIDENT INVENSYS-TRICONEX | 825K € | ||
| SI | 2007 2008 | SYSTEM EXPANSION | UREA QATAR | HONEYWELL S.P.A. | QAFCO | TPS HONEYWELL | 121K € | ||
| SI | 2007 2008 | ESD SOFTWARE DEVELOPMENT | KINEF HYDROCRACKER COMPLEX KIRISHI RUSSIA | HONEYWELL CONTROL INT. | KINEF | SAFETY MANAGER HONEYWELL | 200K € | ||
| IE | 2007 2008 | JUBAIL EXPORT REFINERY PROJECT | REFINERY SAUDI ARABIA | FRONT END ENGINEERING | TECHNIP | ARAMCO TOTAL | 19K | ||
| IE | 2007 | FIRE & GAS SUPERVISORY SYSTEM | HYDROFINER PLANT GREECE | FIELD AND CONTROL ROOM DETAIL ENGINEERING | TECHNIP | MOTOR OIL HELLAS | 2.1K | ||
| SI | 2007 | ISOMERIZATION PLANT REVAMPING | ISOMERIZATION PLANT VENEZIA | TECHNIP ITALY | ENI - RAFFINERIA DI VENEZIA | PLC H51Q-HRS WIZCOM HIMA-AXEDA SUPERVISOR | 249K € | ||
| SI | 2007 | CONTROL SYSTEM DEVELOPMENT | GAS PLANT MAZZARA DEL VALLO ITALY | HONEYWELL | SNAM RETE GAS | TDC-3000 HONEYWELL | 64K € | ||
| IE | 2006 2007 | REFINERY REVAMPING | REFINERY ESFAHAN IRAN | BASIC DESIGN / FEASIBILITY STUDY | TECHNIP | NATIONAL IRANIAN PETROCHEM. CO. | 5.4K | ||
| SI | 2006 2007 | ODS NEW STATIONS / 4 SENSOR REVAMPING | METRO STATIONS COPENHAGEN | ROCKWELL | ANSASLDO TR. SIST FER | SIC SENSOR ROCKWELL | 800K € | ||
| SI | 2006 2007 | ESD REVAMPING COMPRESSOR K2451/2251 + LOCAL PANEL | REFINERY ROMA | RAFFINERIA DI ROMA | RAFFINERIA DI ROMA | H51 HIMA | 118K € | ||
| SI | 2006 2007 | AUTOMATION CONTROL SYSTEM UPGRADE | RESINS PLANT CAIVANO (ITA) | ROCKWELL AUTOMATION | PPG | CONTROL LOGIX ROCKWELL | 110K € | ||
| SI | 2006 2007 | RENINERY TANK FARM & BIODIESEL PLANT 7 CCS SYSTEM | ROMANIA/UK ESTONIA POLAND BULGARY GREECE | DESMET BALLESTRA OLEO SPA | MARTIFER ENERGIA / GREENERGERGY INT.LTD/ BIODIESEL LTD/BIOPALIWA S.A. SLUNCHEVI/GF ENERGY | CONTROL LOGIXS7-400 INTOUCH WINCC ROCKWELL WONDERWARE SIEMENS | 850K € | ||
| SI | 2006 2007 | EMG PIPELINE PROJECT EAST MEDITERRANEAN GAS | EAST MEDITERRANEAN GAS EGYPT ISRAEL | FOXBORO SCADA | KTI STAER | H51Q PCS SYSTEM SCADA A2 HIMA INVENSYS | 324K € | ||
| IE | 2006 | INA SULPHUR RECOVERY UNIT | SULPHUR PLANT CROATIA | FRONT END ENGINEERING | KTI | EBDR | 3.2K | ||
| IE | 2006 | INA SULPHUR RECOVERY UNIT | NATURAL GAS PLANT CROATIA | FRONT END ENGINEERING | KTI | EBRD | 3.2K | ||
| IE | 2006 | EMG GAS PLANT PIPELINE | GAS PLANT EGYPT | FRONT END ENGINEERING | KTI | EGPC | 6.0K | ||
| IE | 2006 | OK LNG DEVELOPMENT PROJECT | LNG PLANT OLOKOLA NIGERIA | FRONT END ENGINEERING | SNAMPROGETTI | NIGERIA NNPC | 2.5K | ||
| IE | 2006 | OK LNG DEVELOPMENT PROJECT | LNG PLANT OLOKOLA NIGERIA | FRONT END ENGINEERING | TECHNIP | NIGERIA NNPC | 6.0K | ||
| IE | 2005 2006 | YANSAB ETHYLENE PLANT | ETHYLENE PLANT SAUDI ARABIA | DETAIL ENGINEERNG AND REQUISITIONING | TECHNIP | SABIC | 6.0K | ||
| IE | 2005 2006 | KHURSANIYAH - GAS PLANT | GAS PLANT SAUDI ARABIA | DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | SAUDI ARAMICO | 18K | ||
| SI | 2005 2006 | DCS /ESD APPLICATION SW AND INTEGRATION FOR POLYPROPILENE AND ETHYLENE EXPANSION PROJECT | POLYPROPYLENE AND ETHYLENE ISRAEL | HONEYWELL S.p.A. | CARMEL OLEIFINS LTD | TDC 300 / FSC HONEYWELL | 350K € | ||
| IE | 2005 | TOTAL RAFFINERIE DE PROVENCE HYDROCRACHER | HYDROCRACKER COMPLEX FRANCE | DETAIL ENGINEERING AND REQUISITIONING | KTI | TOTAL | 3.3K | ||
| SI | 2005 | DCS APPLICATION S.W. AND INTEGRATION FOR EXPANSIONDCS APPLICATION S.W. AND INTEGRATION FOR EXPANSION | PRESSURIZATION CONTROL TURIN (ITALY) | HONEYWELL S.p.A. | AEM TORINO | PKS - HC900 HONEYWELL | 20K € | ||
| SI | 2005 | DCS APPLICATON S.W. FOR NEW AUXILIARY BOILER 200 t/h | REFINERY MESAIEED QATAR | HONEYWELL S.p.A. | QAFCO S.A.Q. | TDC 300 HONEYWELL | 20K € | ||
| SI | 2005 | DCS APPLICATION S.W. AND INTEGRATION for WWT | REFINERY CORINTH GREECE | HONEWELL S.p.A. | M.O.H. (MOTOR OIL HELLAS) | TDC 300 HONEYWELL | 65K € | ||
| SI | 2005 | PHASE 3 AND TEST TRACK OBSTACLE DET. SYSTEM | TEST TRACK OF COPENHAGEN METRO SYSTEM IMPROVMENT | ROCKWELL AUTOMATION | ANSALDO SPA | TEST EQUIPMENT ROCKWELL PROGRAM | 56K € | ||
| SI | 2005 | EMERGENCY SHUT DOWN SYSTEMS UPGRADING FOR VARIOUS UNITS | VARIOUS PROCESS UNITS UPGRADING FALCONARA (ITA) | API REFINERY | API REFINERY | HIMA H51QRS 6 PES SYSTEMS | 395K € | ||
| IE | 2004 2005 | KIRISHI HYDROCRACKER COMPLEX | HYDROCRACKER COMPLEX RUSSIA | FIELD INSTRUMENTATION DETAIL ENGINEERING AND REQUISITIONING | KTI | KIRISHI NEFTEORGSYYNTEZ | 4.6K | ||
| IE | 2004 2005 | ELETTRODTSTIC PRECIPITATOR FOR AIR PRE-HEATER | HYDROFINER PLANT GREECE | FIELD AND CONTROL ROOM DETAIL ENGINEERING | KTI | MOTOR OIL HELLAS | 2.1K | ||
| SI | 2004 2005 | H.W. AND S.W. MAINTENANCE ON-CALL ASSISTANCE CONTRACT | REFINERY ROME | FINA SPA | FINA SPA | TDC 300 AND OTHER PLC SYSTEMS HONEYWELL | 26K € | ||
| SI | 2004 2005 | H.W. AND S.W. MAINTENANCE ON-CALL ASSISTANCE CONTRACT | REFINERY FALCONARA (ITA) | API - REFINERY | API - REFINERY | H51 HRS HIMA | 28K € | ||
| SI | 2004 2005 | H.W. AND S.W. MAINTENANCE ON-CALL ASSISTANCE CONTRACT | PETROCHEMICAL UNITS MILAZZO (ITA) | RAFFINERIA DI MILAZZO | AGIP REFINERY | PLC-5 HIMA SIEMENS PLC ROCKWELLL SIEMENS HIMA | 32K € | ||
| SI | 2004 2005 | H.W. AND S.W. MAINTENANCE ONCALL ASSISTANCE CONTRACT | PETROCHEMICAL UNITS SARROCH (ITA) | SARAS | SARAS REFINERY | PLC-5 LOAD SHEDDING PMS ROCKWELL | 32K € | ||
| SI | 2004 2005 | SITE ASSISTANCE COMMISSIONING OF VARIOUS DCS/ESD/F&G SYSTEMS PROVIDED BY PROGRAM | VARIOUS ABU DHABI GREECE QATAR EGYPT ITALY ETC | TECHNIP HONEYWELL ROCKWELL SIEMENS HIMA | TAKREER M.O.H. AGIP ENICHEM & OTHERS | FOXBORO TRIPLEX FSC HONEYWELL ROCKWELL SIEMENS HIMA | 198K € | ||
| SI | 2004 2005 | ESD EXISTING ESD SYSTEMS UPGRADING IN TO PLC TECHNOLOGY | ALL REFINERY UNITS GELA (ITA) | TECHNIP ITALY S.p.A. | GELA REFINERY AGIP SPA | HIMA H51Q HIMA GERMANY | 850K € | ||
| IE | 2004 2005 | UNLEADED GASOLINE LOW SULPHUR GAS PROJECT | GASOLINE LOW SULPHUR GAS PLANT ABU DHABI | DETAIL ENGINEERING / REQUISITIONING FOLLOW UP | TECHNIP | TAKREER | 1.8K | ||
| SI | 2004 | DCS AND ESD SYSTEMS APPLICATON S.W. AND INTEGRATION OF 240 STD CABINETS AND C.R. CONSOLES | UNLEADED GASOLINE & LOW SULPHUR GAS OIL ABU DHABI | INVENSYS SYSTEMS ITALIA S.p.A. | ABU DHABI OIL REFINING COMPANY (TAKREER) | FOXBORO IA (DCS) TRICONEX (ESD) FOXBORO TRICONEX | 1,100K € | ||
| SI | 2004 | ELECTRICAL POWER SUPERVISION SYSTEM | SARAS REFINERY SARTROCH (ITA) | ROCKWELL | SARAS REFINERY | PLC-5 /CONTROL LOGIX ROCKWELL | 138K € | ||
| SI | 2004 | DRIER REGENERATION CONTROL SYSTEM UNLEAD GASOLINE/LOW SULPHUR GAS OIL | UNLEAD GASOLINE TAKREER ABU DHABI (UAE) | TECHNIP ITALY S.p.A. | TAKREER REFINING COMPANY | CONTROL LOGIX ROCKWELL | 180K € | ||
| SI | 2004 | DCS AND ESD SYSTEMS APPLICATON S.W. AND INTEGRATIONI OF 60 STD CABINETS AND C.R .CONSOLES | REFINERY EXPANSION CORINTH GREECE | HONEYWELL S.p.A. | M.O.H (MOTOR OIL HELLAS) | TDC 300 TPS AND FSC HONEYWELL | 560K € | ||
| SI | 2004 | FIRE & GAS DETECTION & SUPERVISORY SYSTEM | REFINERY EXPANSION CORINTH GREECE | TECHNIP ITALY S.p.A. | M.O.H (MOTOR OIL HELLAS) | SIEMENS - CERBERUS AND G.MONITOR | 450K € | ||
| SI | 2004 | EMERGENCY SHUT DOWN SYSTEM | BUHASA ABU DHABI (UAE) | SNAM PROGETTI SPA | BHUASA ABU DHABI | TRICONEX INVENSYS | 60K € | ||
| SI | 2004 | MATERIAL SUPPLY FOR DISTR. CABINET, LOCAL PANEL, PUSH BUTTONS | REFINERY EXPANSION CORINTH GREECE | TECHNIP ITALY S.p.A. | M.O.H (MOTOR OIL HELLAS) | VARIOUS PROGRAM | 160K € | ||
| SI | 2004 | FIRE & GAS DETECTION & SUPERVISORY SYSTEM UNIT 8-12 | AGIP REFINERY GELA (ITA) | TECHNIP ITALY S.p.A. | GELA REFINERY AGIP SPA | SIEMENS-CERBERUS AND G.MONITOR | 88K € | ||
| SI | 2004 | ESD SYSTEM INTEGRATION - AGIP SANNAZZARO | REFINERY AGIP SANNAZZARO | ROCKWELL AUTOMATION | AGIP SANNAZZARO | PLC 5 ROCKWELL | 80K € | ||
| SI | 2004 | SITE ASSISTANCE DCS UP GRADING | POLI-PROPIL.2nd EXTENSION - DUSHANZI (CHINA) | TECHNIP ITALY S.p.A. | DPC-CHINA | TDC 3000 HONEYWELL | 160K € | ||
| IE | 2003 2004 | HYDROFINER PROJECT | HYDROFINER PLANT GREECE | FIELD AND CONTROL ROOM DETAIL ENGINEERING | TECHNIP | MOTOR OIL HELLAS | 6.0K | ||
| IE | 2003 | PE PLANT 2ND EXTENSION | PE PLANT 2ND EXTENSION CHINA | CONTROL ROOM DCS ENGINEERING | TECHNIP | DUSHANZI - PETROCHEMICAL | 2.6K | ||
| SI | 2003 | SAMPLE COLLECTION SKIDS & L. PANELS - G.T.L. PROJECT | GTL MOSSEL BAY SOUTH AFRICA | TECHNIP ITALY S.p.A. | PETROSA | SKID VARIOUS | 195K € | ||
| SI | 2003 | SITE ASSISTANCE DCS UP GRADING | POLI-PROPIL.2nd EXTENSION - DUSHANZI (CHINA) | TECHNIP ITALY S.p.A. | DPC-CHINA | TDC 3000 HONEYWELL | 160K € | ||
| SI | 2003 | DCS SYSTEM | GASOIL PURIFICATION CECCANO (ITA) | VISCOLUBE SPA | VISCOLUBE SPA | CS1000 YOKOGAWA | 48K € | ||
| SI | 2003 | PLC SYSTEM | THIOPAQ ACID GAS TREATMENT ELMEX (EGYPT) | TECHNIP ITALY S.p.A. | AMOC | CONTROL LOGIX ROCKWELL | 160K € | ||
| SI | 2003 | OBSTACLE DETECTION SYSTEM | COPENHAGEN METRO | ANSALDO | COWI | PLC & LASER SYSTEMS ROCKWELL | 440K € | ||
| IE | 2002 2004 | UNLEADED GASOLINE LOW SULPHUR GAS PROJECT | GASOLINE LOW SULPHUR GAS PLANT ABU DHABI | FIELD INSTRUMENTATION DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | TAKREER | 32K | ||
| IE | 2002 2004 | AUTOMATION SYSTEM MODERNIZATION | ETHYLENE PRIOLO | CONTROL ROOM DETAIL ENGINEERING | TECHNIP | POLIMERI EUROPA | 15K | ||
| IE | 2002 2003 | QATIF FACILITIES BERRI GAS PLANT | GAS PLANT BERRI QATAR | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | ARAMCO | 13K | ||
| IE | 2002 2003 | REPSOL TECHNICAL SPEC. REVIEW / UPDATE | REPSOL INSTRUMENT SECTION SPAIN | REPSOL STANDARDS IMPROVEMENT / UP DATING | TECHNIP | REPSOL | 1.5K | ||
| IE | 2002 2003 | MOSSELBAY OFF SHORE - FT SC - UNIT | GAS TO LIQUID (GTL) SOUTH AFRICA | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | PETROSA | TDC - 3000 | 230K € 3.0K | |
| IE | 2002 | UREA PLANT | UREA PLANT IRAN | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | SNAMPROGETTI | NPC | 4.5K | ||
| IE | 2002 | NEW SULPHUR PLANT | SRU UNITS GREECE | FIELD AND CONTROL ROOM DETAIL ENGINEERING | HONEYWELL | MOH | 5.0K | ||
| IE | 2002 | HARADH - GAS PLANT UTILITIES AND OFFSITE FACILITIES | GAS PLANT SAUDI ARABIA | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | ARAMCO | 6.0K | ||
| IE | 2002 | PTA ZHUHAI | PTA PLANT ZHUHAI - CHINA | FIELD AND CONTROL ROOM DETAIL ENGINEERING | TECHNIP | AZCCC | 12K | ||
| IE | 2002 | PHARMACEUTICAL PLANT PUFA FER 2 REVAMPING | PFA FER 2 CAPUA | FIELD INSTRUMENTATION DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | DSM (CAPUA) | 4.5K | ||
| SI | 2002 | AREA FLAME DETECTION SYSTEM | PTI ZHUHAI CHINA | TECHNIP ITALY S.p.A. | AZCC | MICROPACK | 56K € | ||
| SI | 2002 | STATION EXPANSION | PETROCHEMICAL UNITS OMAN | HIMA | OHI | H51- q | 50K € | ||
| SI | 2002 | PLC UPGRADE | REFORMING MILAZZO (ITA) | RAFFINERIA DI MILAZZO | RAFFINERIA DI MILAZZO | PLC5 ROCKWELL | 160K € | ||
| SI | 2002 | ESD SYSTEMS (n. 5 systems) | POLYMER PLANT KHOUZESTAN (KZPC) | HIMA | HIMA | H51 HIMA | 376K € | ||
| SI | 2002 | POWER NETWORK CONTROL SYSTEM | REFINERY CAGLIARI (ITA) | SARAS | SARAS | SYSTEM POWER MONITOR ROCKWELL | 90K € | ||
| SI | 2002 | DCS SYSTEM | NEW POLYMERS PLANT BANDAR IMAM (IRAN) | SNAM PROGETTI | PIDMCO | DELTA -V EMERSON PROCESS | 74K € | ||
| SI | 2002 | PLC SYSTEM (n 2 systems) | SULPHUR SVSS MDEA ANCONA (ITA) | HIMA | HIMA | H51 HIMA | 120K € | ||
| SI | 2002 | PLC SYSTEM (n 1 system) | SPENT CAUSTIC THERMAL OXIDATION QATAR | HIMA | HIMA | H51 HIMA | 70K € | ||
| SI | 2002 | AUXILIARY CABINETS | FUELS AND LUBE REFINERY GREECE | TECHNIP ITALY S.p.A. | M.O.H. (MOTOR OIL HELLAS) | PROGRAM STD | 160K € | ||
| SI | 2002 | FIELD INSTRUMENTATION PACKAGE MATERIAL SUPPLY | SULPHUR GREECE | TECHMIP KTI S.p.A. | M.O.H. (MOTOR OIL HELLAS) | VARIOUS | 240K € | ||
| IE | 2001 2002 | AUTOMATION SYSTEM MODERNIZATION | ETHYLENE PLANT PORTO TORRES | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | ENICHEM | 7.2K | ||
| IE | 2001 2002 | ADVANCED CONTROL SYSTEM AND REACTOR CONTROL | POLYETHYLENE PLANT CHINA | CONTROL SYSTEM UPGRADING | TECHNIP | DPC CHINA | 8.4K | ||
| IE | 2001 2002 | FUEL AND LUBE UNITS | FUEL AND LUBE UNITS GREECE | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | MOTOR OIL HELLAS | 11K | ||
| IE | 2001 | FCC REVAMPING | FCC SCANRAFF - SWEDEN | FIELD AND CONTROL ROOM DETAIL ENGINEERING AND REQUISITIONING | TECHNIP | SCANRAFF | 3.6K | ||
| IE | 2001 | TECHNICAL ROOM REVAMPING ACTIVITIES | TECHNICAL ROOM FALCONARA | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | API | API | 2.2K | ||
| IE | 2001 | SRU NEW PLANT | Q-CHEM QATAR | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | KTI | Q-CHEM | 1.5K | ||
| SI | 2001 | PLC SYSTEM | BIOLOGICAL TREATMENT GREECE | TECHNIP | M.O.H. | PLC5 ROCKWELL | 65K € | ||
| SI | 2001 | DCS/ESD ENGINEERING (PHASE 2) | POLYETHILENE PLANT DUSHAZI CHINA | TECHNIP | DPC | TDC-3000 HONEYWELL | 98K € | ||
| SI | 2001 | FIELD GAS LIFT PROJET SCADA SYSTEM | GAS PLANT QATAR | SNAM PROGETTI | QGPC | PLC5 PLANTSCAPE HONEYWELL ROCKWELL | 190K € | ||
| SI | 2001 | PLC SYSTEM IMPLEMENTATION M.C. & LOCAL PANEL SUPPLY | PTA TAIWAN | TECHNIP | CAPCO | PLC-5 AND AUX MAT.ROCKWELL VARIOUS | 385K € | ||
| SI | 2001 | PLC SYSTEM IMPLEMENTATION MARSH. AND LOCAL PANEL SUPPLY | PTA CHINA | TECHNIP | AZCC | PLC 5 ROCKWELL VARIOUS | 490K € | ||
| SI | 2001 | ESD RELAY SYSTEM | ETHILENE PLANT P.TO TORRES | ENICHEM | ENICHEM | PROGRAM STD VARIOUS | 65K € | ||
| SI | 2001 | PLC SYSTEM | DEMI PACKAGE FOR PTA CHINA | IONICS - ITALBA | AZCC | PLC-5 ROCKWELL | 75K € | ||
| SI | 2001 | ESD SW IMPLEMENTATION | PTA CHINA | TECHNIP | AZCC | FSC HONEYWELL SMS | 75K € | ||
| SI | 2001 | ESD SW IMPLEMENTATION | PTA TAIWAN | TECHNIP | AZCC | FSC HONEYWELL SMS | 490K € | ||
| SI | 2001 | DCS/ES REVAMPING | POLYETHILENE PLANT DUSHAZI CHINA | TECHNIP | DPC | TDC-3000 HONEYWELL | 160K € | ||
| IE | 2000 2001 | FCC UNIT | FCC COMPLEX AND NCCR CONSTRUCTION GREECE | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | TECHNIP | MOTOR OIL HELLAS | 4.8K | ||
| SI | 2000 | DCS SW CONFIGURATION | HIDD DFS & SEEF BS BAHRAIN | ROCKWELL AUTOMATION | MINISTRY OF ELE. & WATER | PLC-5 ROCKWELL AUTOMATION | 128K € | ||
| SI | 1999 2001 | DCS/ESD SW CONFIGURATION | REFINERY UPGRADING GREECE | HONEYWELL USA | MOTOR OIL HELLAS | TDC-3000 HONEYWELL | 280K € | ||
| SI | 1999 2000 | POWER DISTR. CABINET & LOCAL PANEL | REFINERY UPGRADING GREECE | TECHNIP ITALY | MOTOR OIL HELLAS | PROGRAM STD VARIOUS | 60K € | ||
| SI | 1999 2000 | MARSHALLING CABINETS POWER DITR. CABINETS DCS/ESD CONFIG. | REFINERY UPGRADING GREECE | HONEYWELL USA | MOTOR OIL HELLAS | PROGRAM STD VARIOUS | 180K € | ||
| IE | 1999 | ETHANE RECOVERY UNIT | ETHANE RECOVERY UNIT QATAR | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | TECHNIP | QAPCO | 2.9K | ||
| IE | 1999 | HOT OIL HEATER | HOT OIL ROME | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | FINA (RAFF. DI ROMA) | FINA | 2.1K | ||
| IE | 1999 | BASIC DESIGN | UREA & AMMONIA PLANT KUWAIT | INSTRUCTION TO BIDDER | TECHNIP | P.I.C. | 1.2K | ||
| SI | 1999 | AUTOMATION SYSTEM SUPPLY AND IMPLEMENTATION | HDPE PLANT PORTO TORRES ITALY | SIEMENS | ENICHEM | S5-155 H & PCS SIEMENS | 190K € | ||
| SI | 1999 | REINSTRUMENTATION WITH DCS | ETHILENE PLANT P.TO MARGHERA | TECHNIP ITALY | ENICHEM | AUSO ITALTEL | 45K € | ||
| SI | 1999 | SUPERVISION SYSTEM | SMOKE TREATMENT PLANT PORTOVESME ITALY | ROCKWELL AUTOMATION | ALCOA ITALIA | RS-VIEW ROCKWELL AUTOMATION ALLEN BRADLEY | 52K € | ||
| SI | 1999 | PLC CONTROL SYSTEMS | MIDOR REFINERY EGYPT | ELLIOTT INC. | MIDOR | GE SERIES GENERAL ELECTRIC | 45K € | ||
| SI | 1999 | ESD SYSTEMS (N. 16 SYSTEMS) | MIDOR REFINERY EGYPT | HIMA | MIDOR | H51 HIMA | 350K € | ||
| SI | 1999 | LOCAL PANEL FOR HEATERS | MIDOR REFINERY EGYPT | TECHNIP INTERNATIONAL | MIDOR | PROGRAM STD VARIOUS | 160K € | ||
| SI | 1999 | AUXILIARY CABINETS | S.R.U. & H2 PLANT EGYPT | KTI | MIDOR | PROGRAM STD VARIOUS | 45K € | ||
| SI | 1999 | ADVANCED PROCESS CONTROL IMPLEM. SW CONFIG. & DCS INTERGR. | RMP KUWAIT | FOXBORO | KNPC | I/A SERIES FOXBORO | 500K € | ||
| SI | 1999 | SW MODIFICATION | AGIPGAS NAPOLI | AGIPGAS | AGIPGAS | PLC S7 SIEMENS | 28K € | ||
| IE | 1998 | CONTROL ROOM REVAMPING | PRIOLO PETROCHEMICAL UNITS PRIOLO ITALY | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | SNAMPROGETTI SUD | ERG PETROLI | 2.8K | ||
| IE | 1998 | DCS UPGRADING BASIC DESIGN | MOTOR OIL HELLAS GREECE | CONCEPTUAL DESIGN FOR DCS IMPLEMENTATION | TECHNIPETROL | MOTOR OIL HELLAS | 1.8K | ||
| IE | 1998 | NEW C.ROOM ENGINEERING | PETROCHEMICAL UNITS DUBAI | FIELD INSTR. AND CONTROL ROOM DETAIL ENGINEERING | YOKOGAWA | ENOC | 8.0K | ||
| IE | 1998 | ETHYLENE PLANT REVAMPING | ETHYLENE PLANT PORTO MARGHERA VENICE | FIELD & CONTROL ROOM ENGINEERING EDS DETAIL ENG. | TECHNIPETROL | ENICHEM | 2.8K | ||
| SI | 1998 | DCS CONFIGURATION ACTIVITIES | ISOMERIZATION REFORMER POLAND | HONEYWELL | PKN S.A. | PLC AEG PLC TRICONEX MODICON TRICONEX | 230K € | ||
| SI | 1998 | SOFTWARE CONFIGURATION | SNAMPROGETTI OFF-SITE, UREA AMMONIA ARGENTINA | FOXBORO ITALIA | SNAMPROGETTI | DCS / IA SERIES FOXBORO | 900K € | ||
| SI | 1998 | DCS, PLC & ACCESSORIES | ISOMERIZATION & REFORMING PLANT POLAND | TECHNIP ITALY | RGSA GDANSK POLAND | DCS HONEYWELL / PLC TSX QUANTUM HONEYWELL / MODICON | 89K € | ||
| SI | 1998 | LOAD SHEDDING SYSTEM, SIMULATION SYSTEM & MONITORING STATIONS | ELECTRICAL NETWORK & SUBSTATIONS ITALY | ROCKWELL AUTOMATION | SARAS | PLC 5/40E PLC 5/60 (N. 6 CPU) ALLEN BRADLEY | 220K € | ||
| SI | 1998 | HYDROGEN PEROXIDE | HYDROGEN PEROXIDE PLANT ITALY | AUSIMONT | AUSIMONT S.P.A. | I/A SERIES FOXBORO | 43K € | ||
| SI | 1998 | PSD & ESD (N. 3 SYSTEMS) | FCC (R. URC UOP1) REACTOR COLOMBIA | TECHNIPETROL | ECOPETROL | H51 HIMA | 170K € | ||
| SI | 1998 | PSD & ESD SYSTEM DCS CONFIGURATION | UREA CHINA | FISHER ROSEMOUNT | P. R. OF CHINA | RS3 FISHER ROSEMOUNT | 95K € | ||
| SI | 1998 | BMS & PROCESS SEQUENCE | HYDROTREATER SULPHUR AMINE SWEDEN | TECHNIPETROL | NYNAS AB | S5-115H S5-115F | 76K € | ||
| SI | 1998 | CENTRIFUGES AUTOMATION | SODIUM SALT MANUFACTURING ITALY | FLEXSYS | FLEXSYS | S - 9000 | |||
| SI | 1998 | PROCESS & SEQUENCE CONTROL | PETROCHEMICAL DUBAI | YOKAGAWA | ENOC | CENTUM CS YOKAGAWA | 110K € | ||
| SI | 1997 | INSTRUMENTATION REVAMPING OF 8+3+5 GATHERING CENTERS IN KUWAIT (DCS + AUXILIARY EQUIPMENT IN CONTROL ROOM) | OIL FIELDS KUWAIT | TECHNIPETROL | K.O.C. | TDC 3000 HONEYWELL | 120K € | ||
| SI | 1997 | INSTRUMENTATION REVAMPING OF 5 GATHERING CENTERS (PSD & ESD) (N. 4 SYSTEMS) | OIL FIELDS KUWAIT | TECHNIPETROL | K.O.C. | H51 HIMA | 600K € | ||
| SI | 1997 | CONTROL ROOM EQUIPMENT (ESD) | HP LLDPE CHINA | HONEYWELL | P. R. OF CHINA | TRUSTED ICS REGENT ICS TRIPLEX | 98K € | ||
| SI | 1997 | CONTROL ROOM EQUIPMENT DCS CONFIG. | HP LLDPE CHINA | HONEYWELL | P. R. OF CHINA | TDC 3000 HONEYWELL | 130K € | ||
| SI | 1997 | PSD & ESD SYSTEM DCS CONFIGURATION | UREA CHINA (HUAINAN) | FISHER ROSEMOUNT | P. R. OF CHINA | PLC 5/40 ALLEN BRADLEY | 75K € | ||
| SI | 1997 | PSD & ESD SYSTEM DCS CONFIGURATION | UREA CHINA (ANYANG) | FISHER ROSEMOUNT | P. R. OF CHINA | PLC 5/40 ALLEN BRADLEY | 75K € | ||
| SI | 1997 | PSD & ESD SYSTEM DCS CONFIGURATION | UREA CHINA (HEICHI) | FISHER ROSEMOUNT | P. R. OF CHINA | PLC 5/40 ALLEN BRADLEY | 88K € | ||
| SI | 1997 | PSD & ESD SYSTEM | SULPHUR RECOVERY ITALY | ROCKWELL AUTOMATION | RAFFINERIA DI MILAZZO S.P.A. | PLC 5/40 ALLEN BRADLEY | 84K € | ||
| SI | 1997 | HOT OIL BMS SYSTEM | UNIFYING HOT OIL SYSTEM ROME | RAFFINERIA DI ROMA | FINA | FSC HONEYWELL | 75K € | ||
| SI | 1997 | SYNTHESIS FOR PHARMA MANUFACTURING | IBI SUD S.P.A. APRILIA (LT) | SIEMENS | IBI SUD S.P.A. | PCS SYSTEM S5-155H SIEMENS | 98K € | ||
| IE | 1996 1997 | PTA PROJECT | PTA-3 - AMOCO CHEMICAL GEEL - BELGIUM | CONTROL ROOM ENGINEERING | TECHNIPETROL | AMOCO - BELGIUM | 4.7K | ||
| IE | 1996 1997 | PROPYLENE OXIDE PLANT | PROPYLENE OXIDE PLANT PRIOLO ITALY | CONTROL INSTRUMENTATION REVAMPING | SNAMPROGETTI SUD | ENICHEM | 3.2K | ||
| IE | 1996 1997 | CRUDE OIL FIELD | CRUDE OIL FIELD VAL D'AGRI (ITALY) | OIL FIELD CONTROL ROOM ENGINEERING | TECHNIPETROL | AGIP SPA | 9.8K | ||
| SI | 1996 1997 | CONTROL ROOM AUXILIARY EQUIPMENT | AMOCO CHEMICAL BELGIUM GEEL | TECHNIPETROL | AMOCO BELGIUM | VARIOUS | 180K € | ||
| SI | 1996 1997 | DEMI WATER PRODUCTION SYSTEM | CTE E SERVIZI ROMA | RAFFINERIA DI ROMA | FINA | CUBE ORSI AUTOMAZIONE | 76K € | ||
| SI | 1996 1997 | GASOLINE BLENDING AUTOMATION SYSTEM | MOVIMENTAZIONE PRODOTTI ROMA | RAFFINERIA DI ROMA | FINA | GE FANUC GENERAL ELECTRIC | 42K € | ||
| IE | 1996 | FILTERING SYSTEM PACKAGE | VARIOUS | SYSTEM CONTROL AND SW SPECIFICATION | Dr. MULLER (CH) | VARIOUS | 3.5K | ||
| IE | 1996 | ADVANCED CONTROL SYSTEMS | AGIP S.P.A.TARANTO (ITALY) | ADVANCED CONTROL SW SPECIFICATION & DESIGN VARIOUS REFINERY FURNACES | AGIP S.P.A. | AGIP S.P.A. | 2.9K | ||
| SI | 1996 | SEQUENCE & BATCH CONTROL (N. 2 SYSTEMS) | PPG CAIVANO ITALY | SIEMENS | SIEMENS | SIMATIC PCS APT SIEMENS | 78K € | ||
| SI | 1996 | APPLICATION SW DEVELOPMENT | SUGAR REFINERY SAUDI ARABIA | TPL | SAVOLA | CUBE PMC PROGRAM | 90K € | ||
| SI | 1996 | TOPPING FURNACE BMS SYSTEM | TOPPING ROME | RAFFINERIA DI ROMA | FINA | FSC HONEYWELL | 48K € | ||
| SI | 1996 | SUGAR REFINERY CONTROL ROOM AUXILIARY CABINETS | SUGAR REFINERY POWER MNG SYSTEM SAUDI ARABIA | ORSI AUTOMAZIONE | UNITED SUGAR COMPANY | PLC 5/30 ALLEN BRADLEY | 63K € | ||
| SI | 1996 | AUTOMAZIONE IMPIANTO TRASPORTO PNEUMATICO POLIETILENE CHIPS | LH DPE ENICHEM PORTO TORRES ITALY | CONF. | ENICHEM | SIMATIC PCS SIEMENS | 130K € | ||
| SI | 1996 | PSD & ESD SYSTEM | LCFINER & AUXILIARIES ITALY | ALLEN BRADLEY | AGIP RAFFINAZIONE | PLC 5/60 ALLEN BRADLEY | 110K € | ||
| IE | 1995 | BULDING AUTOMATION | ENEL NAPOLI (ITALY) | FUNCTIONAL SPECIFICATION FOR BLDG AUTOMATION ENEL NAPOLI | ELSAG-BAILY | ENEL | 6.0K | ||
| IE | 1995 | PVC PLANT | PVC SPOLANA PRAGA | FUNCTIONAL SPECIFICATION & LOGIC IMPLEMENTATION OF INDUSTRIAL INCENERATORS AUT. | KTI | SPOLANA | 2.6K | ||
| IE | 1995 | CONTROL ROOM ENGINEERING | REFINERY MODERNIZAT. PROJ. PRIOLO (ITALY) | PROCESS CONTROL REVAMPING | HONEYWELL | AGIP - REFINERY - PRIOLO | 1.2K | ||
| SI | 1995 | BATCH PLANTS AUTOMATION | AKZO CHEMICAL TERMOLI (ITALY) | AKZO CHEMICAL | AKZO CHEMICAL | MAS+SIST. 9000 HONEYWELL | 60K € | ||
| SI | 1995 | REVAMPING THERMAL & REFRIGERATING PLANTS | TELECOM ACILIA ((ITA) | HONEYWELL | TELECOM | SCAN 3000 IPC 62035 HONEYWELL | 32K € | ||
| SI | 1995 | BMS SYSTEM PSD & ESD SYSTEM SEQUENCE CONTROL (N. 2 SYSTEMS) | PTA (AMOCO) U.S.A. | TECHNIPETROL | AMOCO | PLC 5/30 ALLEN BRADLEY | 210K € | ||
| SI | 1995 | CONTROL ROOM AUXILIARY EQUIPMENT DELIVERY | PTA (AMOCO) MALAYSIA | TPL | AMOCO | VARIOUS | 98K € | ||
| SI | 1995 | BMS SYSTEM PSD & ESD SYSTEM SEQUENCE CONTROL (N. 4 SYSTEMS) | PTA (AMOCO) MALAYSIA | TPL | AMOCO | PLC 5/20 ALLEN BRADLEY | 230K € | ||
| SI | 1995 | CONTROL ROOM AUXILIARY EQUIPMENT DELIVERY | PTA (AMOCO) U.S.A. | TECHNIPETROL | AMOCO | VARIOUS | 120K € | ||
| SI | 1995 | PSD & ESD SYSTEM CONTROL ROOM REVAMPING | CATHALYTIC REFORMING HDT MILAZZO | ALLEN BRADLEY | AGIP RAFFINAZIONE | PLC 5/40 ALLEN BRADLEY | |||
| SI | 1995 | PSD & ESD SYSTEM CONTROL ROOM REVAMPING | GROUP B FCC, VACUUM MILAZZO | ALLEN BRADLEY | AGIP RAFFINAZIONE | PLC 5/40 ALLEN BRADLEY | 98K € | ||
| SI | 1995 | PSD & ESD SYSTEM CONTROL ROOM REVAMPING | GROUP C FCC, VACUUM MILAZZO | ALLEN BRADLEY | AGIP RAFFINAZIONE | PLC 5/40 ALLEN BRADLEY | 160K € | ||
| SI | 1995 | PROCESS CONTROL | CDU - HOT OIL HOT WATER TARANTO (IT) | HONEYWELL | AGIP RAFFINAZIONE | TDC 3000 HONEYWELL | 98K € | ||
| SI | 1995 | PSD & ESD SYSTEM CONTROL ROOM AUXILIARY EQUIPMENT | HELLENIC ASPROPYRGOS REFINERY GREECE | INDELIC EUROPE S. A. | HELLENIC ASPROPYRGOS REFINERY | PLC 5/20 ALLEN BRADLEY | 420K € | ||
| IE | 1994 | FCC UNIT (UOP) | FCC (UOP) COLOMBIA | CONTROL ROOM ENGINEERING | HONEYWELL | ECOPETROL | 3.9K | ||
| IE | 1994 | SAFETY SYSTEMS DETAIL ENGINEERING | PTA (AMOCO) MALAYSIA | BMS, PSD & ESD SYSTEM SEQUENCE CONTROL (N 4 SYSTEMS) | T.P.L. | AMOCO | 9.0K | ||
| IE | 1994 | DCS ENGINEERING DETAILS | PTA (AMOCO) MALAYSIA | PROCESS CONTROL REVAMPING | HONEYWELL | AMOCO | 8.0K | ||
| IE | 1994 | TELECOM SYSTEMS | TELECOM CENTER UTILITIES ROME | SUPERVISORY & PROCESS CONTROL SYSTEM | HONEYWELL | ITALCABLE | 1.8K | ||
| SI | 1994 | SEQUENCE & BATCH CONTROL | SODIUM SALT PRODUCTION TERMOLI (IT) | HONEYWELL | AKZO NOBEL | MAS HONEYWELL | 32K € | ||
| SI | 1994 | PSD & ESD (N. 7 SYSTEMS) | FCC (N. URC UOP1) CONTROL ROOM PROC. INT. LOCK | TPL | ECOPETROL | H51 - H41 HIMA | 280K € | ||
| SI | 1994 | PROCESS CONTROL | UTILITIES EXPANSION | HONEYWELL | QAPCO | TDC-3000 HONEYWELL | |||
| SI | 1994 | REACTOR GAS PHASE CONTROL SIMULATION SW | LL - HDPP (BP) IRAN | HONEYWELL / TPL | TPC (IRAN) | TDC-3000 HONEYWELL | |||
| IE | 1993 | HYDROCRACKER UNITS | HYDROCRACKER TARANTO | CONTROL ROOM ENGINEERING | T.P.L. | AGIP | 2.4K | ||
| IE | 1993 | PTA PROJECT | PTA (AMOCO) CHINA | CONTROL ROOM ENGINEERING | T.P.L. | CNTIC | 5.8K | ||
| IE | 1993 | PROPYLENE (BP) | PROPYLENE (BP) CHINA | CONTROL ROOM ENGINEERING | T.P.L. | CNTIC | 8.0K | ||
| SI | 1993 | PSD & ESD (N. 2 SYSTEMS) | HYDROCRACKER (KTI) | ALLEN BRADLEY | AGIP | PLC 5/40 ALLEN BRADLEY | |||
| SI | 1993 | PSD & ESD SYSTEM | PTA (AMOCO) CHINA | HONEYWELL | CNTIC | LOGIC MANAGER HONEYWELL | |||
| SI | 1993 | SEQUENCE & BATCH CONTROL | PTA (AMOCO) CHINA | HONEYWELL | CNTIC | LOGIC MANAGER HONEYWELL | |||
| SI | 1993 | PROCESS CONTROL | PTA (AMOCO) CHINA | HONEYWELL | CNTIC | TDC - 3000 HONEYWELL | |||
| SI | 1993 | PROCESS & SEQUENCE CONTROL | LL - HDPP (BP) IRAN | HONEYWELL | TPC | TDC - 3000 HONEYWELL | |||
| SI | 1993 | PROCESS & SEQUENCE CONTROL | PSA (LINDE) IRAN | HONEYWELL | TPC | TDC - 3000 HONEYWELL | |||
| IE | 1992 | LL-HDPE (BP) | LL-HDPE (BP) TABRIZ (IRAN) | CONTROL ROOM ENGINEERING | T.P.L. | TPC | 9.7K | ||
| IE | 1992 | ETHYLENE OXIDE PLANT | ETHHYLENE OXIDE ARAK (IRAN) | CONTROL ROOM ENGINEERING | TECHNIMONT SPA | ARPC | 4.5K | ||
| IE | 1992 | HYDROCRACKER UNITS | HYDROCRACKER (KTI) MILAZZO (ITALY) | CONTROL ROOM ENGINEERING | T.P.L. | AGIP | 2.5K | ||
| IE | 1992 | POLYPROPYLENE (MITSUI) | POLYPROPYLENE (MITSUI) CANTON (CHINA) | CONTROL ROOM ENGINEERING | T.P.L. | CNTIC | 4.8K | ||
| SI | 1992 | ADVANCED CONTROL STRATEGY IMPLEMENTATION | ETHYLENE OXIDE (SCIENTIFIC DESIGN) VENEZUELA | PRALCA | PRALCA | TDC - 3000 HONEYWELL | |||
| SI | 1992 | SEQUENCE & BATCH CONTROL | MATERIAL COMPOSITE PRODUCT. AEROINDUS. FOGGIA | SIA | ALENIA | S 9000 HONEYWELL | |||
| SI | 1992 | NEW PRODUCT RECIPES IMPL. | DETERGENT PRODUCT. (PROCTER & GAMBLE) POMEZIA | PROCTER & GAMBLE | PROCTER & GAMBLE | TDC - 2000 HONEYWELL | |||
| IE | 1991 | ZINC PRODUCTION | ZINC PRODUCTION | CONTROL ROOM ENGINEERING | SNAMPROGETTI | NUOVA SAMIM | 0.6K | ||
| IE | 1991 | ETHYLENE OXIDE (SCIENTIFIC PLANT) | ETHYLENE OXIDE MARACAIBO (VENEZUELA) | FIELD & CONTROL ROOM ENGINEERING. | T.P.L. | PRALCA | 9.0K | ||
| SI | 1991 | ESD (N. 2 SYSTEMS) | ETHYLENE OXIDE (SCIENTIFIC DESIGN) VENEZUELA | FISHER CONTROLS | PRALCA | REGENT + TRIPLEX | |||
| SI | 1991 | DEMI - WATER PROCESS SEQUENCE | DEMIWATER PRODUCT. (CRISTOFORETTI) VENEZUELA | CRISTOFORETTI | PRALCA | 5000 APRIL | |||
| SI | 1991 | PROCESS WATER TREATMENT SEQUENCE | PROC. WATER TREAT. (CRISTOFORETTI) VENEZUELA | CRISTOFORETTI | PRALCA | 2000 APRIL | |||
| IE | 1990 | ETHYLENE (KTI-TPL) | ETHYLENE (KTI-TPL) BRINDISI (ITALY) | CONTROL ROOM ENGINEERING | T.P.L. | ENICHEM | 3.2K | ||
| IE | 1990 | MTTBE | MTTBE SANNAZZARO (ITALY) | CONTROL ROOM ENGINEERING | SNAMPROGETTI | AGIP | 0.8K | ||
| IE | 1990 | WHITE OILS | WHITE OILS PORT JEROME (FRANCE) | FIELD & CONTROL ROOM ENGINEERING. | T.P.L. | ESSO | 4.9K | ||
| IE | 1990 | PENEX (UOP) | PENEX (UOP) FALCONARA (ITALY) | FIELD & CONTROL ROOM ENGINEERING. | CTIP | API | 1.8K | ||
| IE | 1990 | MTTBE | MTTBE MILAZZO (ITALY) | CONTROL ROOM ENGINEERING | SNAMPROGETTI | AGIP | 0.9K | ||
| IE | 1990 | ETHYLENE (KTI-TPL) | ETHYLENE (KTI-TPL) PRIOLO (ITALY) | INTELLIGENT ALARM SYSTEM | T.P.L. | ENICHEM | 0.8K | ||
| IE | 1990 | ETHYLENE (KTI-TPL) | ETHYLEN (KTI-TPL) BRINDISI (ITALY) | OPERATOR INTERFACE | ESACONTROL | ENICHEM | 0.8K | ||
| SI | 1990 | DRYING PROCESS SEQUENCE | PENEX (UOP) FALCONARA (IT) | API | API | 984-980 MODICON | |||
| IE | 1989 | POLYPROPYLENE (MITSUI) | POLYPROPYLENE (MITSUI) MARACAIBO (VENEZUELA) | CONTROL ROOM ENGINEERING | T.P.L. | PROPILVEN | 6.9K |